
Edinberg Center | Tenant Fit-Up
Owner: Edinberg Center
Architect: CI Designs, Inc.
Location: Burlington, MA
Size: 32,000 SF
Project Overview
Integrated Builders completed the fit-out of the Edinburg Center, which included new classrooms, offices, and treatment rooms equipped with modern fixtures such as whiteboards and operable walls to enhance learning. The project also featured the construction of a new kitchen and dining area for use by clients, students, and staff. Additionally, Integrated Builders created three flexible training and development rooms designed to convert into one larger space. VCT flooring was installed throughout, along with two restroom cores to support the facility’s needs.
From a Client’s Point of View
“General contractor, Integrated Builders, was nothing short of amazing. President John Concannon, intimately involved from start to finish, put together what I consider to be the ‘A’ team. The entire Integrated team truly had our best interest in mind.”
Bryan Blake | President of Calare Properties | Edinburg Center
“This was a challenging project on a tight time-frame, and the project team did a great job getting it completed on time and within the projected budget. We are extremely pleased with the way that the property has turned out, and we are looking forward to settling into our new space.”
Ellen Attaliades | CEO | Edinburg Center















