« Back
Progress begins with precision.
May 12th, 2026
This aerial view at United Commerce Way highlights the early stages of construction as the site begins to take shape, from foundation layout and site preparation to drainage work, access coordination, and ongoing field operations.
Before any structure rises, every successful project is built on careful planning, precise sequencing, and strong coordination in the field.

Posted in the categories Project Updates, Blog.
Additional Articles
Jun26A final look at The Home Depot’s distribution facility A final look at The Home Depot’s completed 600,000 SF distribution facility
See Details
Jun25Interior Warehouse Drone Footage with Interior RailA look inside the scale of The Home Depot’s new 600,000 SF distribution facility in
See Details
Jun24Drone Footage Down the 100' Interior BayThe Home Depot Westminster Facility also includes a 100-foot-wide interior bay designed
See Details
Categories
Recent Articles
- 06/26/26A final look at The Home Depot’s distribution facility
- 06/25/26Interior Warehouse Drone Footage with Interior Rail
- 06/24/26Drone Footage Down the 100' Interior Bay
- 06/23/26360 Drone Footage of Exterior Site
- 06/22/26Project Complete in Westminster, MA
- 06/19/26Mirror, mirror on the slab…
- 06/18/26Not your typical 9–5.
- 06/17/26We are proud to celebrate a very special honor
- 06/10/26The lights are on in North Kingstown.
- 06/8/26United Commerce Way Progress




