Inside a High-Bay Facility Designed for Advanced Manufacturing
April 9th, 2026
Another look inside one of our current Design-Build projects. Progress in this space really puts the scale into perspective. From this vantage point, you can see just how large a 300' x 850' high-bay pre-engineered metal building feels before the full interior build-out takes shape. This view looks down the wide 85' x 100' column bay, designed to support 100' bridge cranes that will serve component manufacturing, final assembly, and pre-delivery testing for the 12-passenger seaglider at this advanced manufacturing facility for Regent.
Additional Articles
Jul24Before the first shovel hits the ground, the numbers need to work.Before the first shovel hits the ground, the numbers need to work.
See Details
Jul22ONE SITE. ONE DAY. COUNTLESS MOVING PARTSDuring a recent visit to our United Commerce Way project, crews were
See Details
Jun26A final look at The Home Depot’s distribution facility A final look at The Home Depot’s completed 600,000 SF distribution facility
See Details



